Skip to content
tralover Plan a trip
Menu ☰

🚗 Day trip · Foz do Iguaçu, Brazil (border with Paraguay), 45 km from central Iguazú Falls

Itaipu Dam

Concrete, water and power on a giant scale

wiki:Itaipu Dam
Photo: Jonas de Carvalho / CC BY-SA 2.0

After days of wild waterfalls, here is water tamed by people. The Itaipu Dam stretches across the Paraná River between Brazil and Paraguay, a wall of concrete and steel so long that it fades into the haze. Behind it lies a lake that reaches far up the river. Inside it, twenty great turbines turn day and night, lighting homes and factories across two countries. You will visit with a guide, by bus, stopping at viewpoints that show the dam's sheer size. If the spillway is open, you will see a man-made waterfall to rival Iguazú. Whatever you think of big engineering, you will not easily forget the scale of this place.

The story of Itaipu Dam

In the 1960s Brazil and Paraguay both claimed the waters of the Paraná near the great Guaíra Falls. They settled the dispute by agreeing to build a dam together. On 26 April 1973 they signed the Itaipu Treaty, creating a binational company to build and run the plant.

Construction was enormous, involving tens of thousands of workers. In October 1982 the side canal gates were closed and the reservoir began to fill. The rising water drowned the Guaíra Falls upstream, once among the largest waterfalls in the world by volume. That loss still saddens many people in the region.

The first generating unit began working on 5 May 1984. The first 18 units came online between 1984 and 1991, and the last two in 2006 and 2007, bringing the total to 20. In 1994 the American Society of Civil Engineers named Itaipu one of the seven wonders of the modern world. For many years it was the world's largest hydroelectric plant by output, until China's Three Gorges Dam overtook it.

The setting

The dam crosses the Paraná River just north of Foz do Iguaçu, with Brazil on the east bank and Paraguay on the west. Its main structure is about 196 metres high, and the whole complex of dams and dykes runs for several kilometres. The reservoir stretches far upstream. On the Brazilian side, a visitor centre is the base for tours. The panoramic tour stops at viewpoints and crosses the top of the dam, while the special tour goes inside the plant to see the control room and machine hall.

Why it matters

Itaipu supplies a large share of Paraguay's electricity and a significant amount of Brazil's. It is clean energy on a huge scale, but it also flooded forests, farms and Guaíra Falls. A visit lets you weigh both sides. The company also runs a biological refuge and an ecomuseum nearby, which tell the story of the land that was changed.

Your walk-through

The stops a guide would take you to, in order.

  1. 1

    Visitor centre

    Tours begin at the visitor centre on the Brazilian side. Before you board, watch the short film about the dam's construction. Look at the scale model. It helps to understand what you are about to see. Book ahead in high season, as the special tour has limited places.

  2. 2

    Central viewpoint

    The bus stops at a viewpoint facing the dam. From here you see the great concrete wall and the huge pipes, called penstocks, that carry water down to the turbines. Each turbine can produce 700 megawatts. Imagine the weight of the lake pressing against that wall, and the precision needed to hold it.

  3. 3

    Spillway

    Next comes the spillway. When the reservoir is high, the gates open and water thunders down a long concrete chute. It can look like a waterfall made by people, and the spray rises just like at Iguazú. When the spillway is closed, you can still see the curved ramps at the end that throw the water into the air to protect the river bed.

  4. 4

    Top of the dam

    The bus drives along the top of the dam. On one side is the lake, calm and wide. On the other side is the drop to the river far below. Somewhere along the crest you cross from the Brazilian half of the dam into the Paraguayan half, since the plant belongs equally to both countries.

  5. 5

    Inside the plant (special tour)

    If you join the special tour, you go inside. The machine hall is a vast space where the tops of the generators line up in a row. In the control room engineers from both countries watch over the plant. The scale and the hum of the place are what most people remember.

Things you might not know

  • Brazil and Paraguay signed the Itaipu Treaty on 26 April 1973.
  • The plant has 20 turbines of 700 megawatts each, 14,000 megawatts in all.
  • Filling the reservoir in 1982 drowned the Guaíra Falls upstream.

Researched November 2026 from: en.wikipedia.org, turismoitaipu.com.br, itaipu.gov.br. Fees and hours change, so check on the day.

Plan my Iguazú Falls trip · free Listen 🎧